Neural Response Interpretation through the Lens of Critical Pathways
Results and benchmarks
Neural Response Interpretation through the Lens of Critical Pathways is the primary contribution described in this paper.
Benchmark evidence is limited
Evidence graph: 2 refs, 1 links.
Utility signals: depth 60/100, grounding 58/100, status medium.
Implementation
Historical official implementation (not recommended for new builds)
Only a historical official implementation is available
Use with caution for new projects; verify against current tooling and maintained community alternatives.
CAMP-eXplain-AI/RoarTorch · 10 stars · Last push Mar 29, 2021
Only historical official repository was found (CAMP-eXplain-AI/RoarTorch).
Open CAMP-eXplain-AI/RoarTorch- Only historical official implementation is available
- No direct maintained implementation is currently verified.
- Only historical official repository was found: CAMP-eXplain-AI/RoarTorch.
- No maintained paper-verified implementation met reliability thresholds.
Compare implementation paths
Compare maintenance quality, reproducibility coverage, and evidence confidence before choosing a reproduction baseline.
- Maintenance
- Stale
- Confidence
- High
- Reproducibility
- Limited
- Stars
- 10
- Last push
- Mar 29, 2021 (1975d)
Official implementation from Papers with Code · Repository link is mentioned in the paper metadata
- No push in 12+ months
- No CI pipeline detected
- No tagged releases
- Maintenance
- Stale
- Confidence
- High
- Reproducibility
- Limited
- Stars
- 12
- Last push
- Jun 23, 2021 (1889d)
Official implementation from Papers with Code · Repository link is mentioned in the paper metadata
- No push in 12+ months
- No CI pipeline detected
- No tagged releases
Reproduction readiness
Major work
No dependency manifest, manual reconstruction required
- CAMP-eXplain-AI/RoarTorch has no requirements.txt, environment.yml, pyproject.toml, or Dockerfile.
- You will need to reverse-engineer dependencies from import statements in the source code.
- Last push was 1975 days ago.
Hardware requirements
- Expect multi-day setup/compute for meaningful reproduction based on current guidance.
Validation caveat
Repositories and ecosystem
Official
- CAMP-eXplain-AI/PathwayGradConfidence: High
CVPR 2021 | Code to reproduce the results of the paper: A Khakzar, S Baselizadeh, S Khanduja, C Rupprecht, ST Kim, N Navab, Neural Response Interpretation through the Lens of Critical Pathways
12 stars · 3 forks · Last push Jun 23, 2021
Community
No additional community repositories detected yet.
Hugging Face artifacts
No trustworthy direct or curated related Hugging Face artifacts were found yet. Use targeted searches to quickly locate candidate models, datasets, and demos.
Tip: start with models, then check datasets and spaces if you need evaluation data or demos.
Research context
Open this paper in HFEPX to review benchmark signals, evaluation modes, and human-feedback protocol context.
Open in HFEPXData includes links from Papers with Code ( CC-BY-SA-4.0 ).